• Client Dashboard
  • |
  • CB HomeCare

This dashboard was hand-crafted and custom built by Chariot... because we appreciate our clients!

  • Tuesday, October 4, 2022

PRINT

Open Projects

Overview Analytics • All Projects

  • 0% Completed
  • 0% In Progress
  • 0% Upcoming

Progress Overview • All Projects

Work
0%
Timeline
0%

0 Total Tasks Due This Week

PROJECT CB Care- April Blog Post

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Blog Topic Status: Done Start Date:04/19/2022 Due Date:04/29/2022 Duration:10 Days Date Completed:05/10/2022
Task Title:CB HomeCare Copywriting Status: Done Start Date:04/20/2022 Due Date:04/22/2022 Duration:2 Days Date Completed:04/28/2022
Task Title:QA Status: Done Start Date:04/21/2022 Due Date:04/21/2022 Duration:1 Days Date Completed:05/10/2022
Task Title:CB Care Review/Approval Status: Done Start Date:04/26/2022 Due Date:04/26/2022 Duration:1 Days Date Completed:05/10/2022
Task Title:Blog Post Status: Done Start Date:04/28/2022 Due Date:04/28/2022 Duration:1 Days Date Completed:05/10/2022

PROJECT CBH • Research and Quoting

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Chat Widget/Feature Status: Done Start Date: Due Date: Duration: Date Completed:09/15/2021

PROJECT Quote - Footer Update

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed

PROJECT CBH • Fixes

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:CBH Blog Image Float Troubleshooting Status: Done Start Date:02/17/2022 Due Date:02/17/2022 Duration:1 Days Date Completed:03/11/2022

PROJECT CBH • November Blog Posts

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Self-Care for Caregivers Status: Done Start Date:11/04/2021 Due Date:01/12/2022 Duration:69 Days Date Completed:01/12/2022
Task Title:Copywriting Status: Done Start Date:11/04/2021 Due Date:11/08/2021 Duration:4 Days Date Completed:11/10/2021
Task Title:QA Status: Done Start Date:11/09/2021 Due Date:11/12/2021 Duration:3 Days Date Completed:11/12/2021
Task Title:CBH Review/Approval Status: Done Start Date:11/12/2021 Due Date:01/11/2022 Duration:60 Days Date Completed:01/11/2022
Task Title:Post Blog Status: Done Start Date:01/12/2022 Due Date:01/12/2022 Duration:1 Days Date Completed:01/12/2022
Task Title:4 Medical Reasons Why Home Care Nutrition Matters Status: Done Start Date:11/11/2021 Due Date:01/13/2022 Duration:63 Days Date Completed:01/12/2022
Task Title:Copywriting Status: Done Start Date:11/11/2021 Due Date:11/15/2021 Duration:4 Days Date Completed:11/15/2021
Task Title:QA Status: Done Start Date:11/16/2021 Due Date:11/17/2021 Duration:1 Days Date Completed:11/18/2021
Task Title:CBH Review/Approval Status: Done Start Date:11/18/2021 Due Date:01/11/2022 Duration:54 Days Date Completed:01/11/2022
Task Title:Post Blog Status: Done Start Date:01/13/2022 Due Date:01/13/2022 Duration:1 Days Date Completed:01/12/2022

PROJECT CBH • December Blog Posts

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Loneliness & Isolation Have Huge Impacts on Health Status: Done Start Date:01/11/2022 Due Date:01/25/2022 Duration:14 Days Date Completed:01/25/2022
Task Title:Copywriting Status: Done Start Date:01/11/2022 Due Date:01/13/2022 Duration:2 Days Date Completed:01/13/2022
Task Title:QA Status: Done Start Date:01/14/2022 Due Date:01/17/2022 Duration:3 Days Date Completed:01/17/2022
Task Title:CBH Review/Approval Status: Done Start Date:01/17/2022 Due Date:01/24/2022 Duration:7 Days Date Completed:01/24/2022
Task Title:Post Blog Status: Done Start Date:01/24/2022 Due Date:01/24/2022 Duration:1 Days Date Completed:01/25/2022
Task Title:Dignity and Respect in Personal Care for the Elderly Status: Done Start Date:01/14/2022 Due Date:01/25/2022 Duration:11 Days Date Completed:01/25/2022
Task Title:Copywriting Status: Done Start Date:01/14/2022 Due Date:01/18/2022 Duration:4 Days Date Completed:01/17/2022
Task Title:QA Status: Done Start Date:01/17/2022 Due Date:01/17/2022 Duration:1 Days Date Completed:01/17/2022
Task Title:CBH Review/Approval Status: Done Start Date:01/17/2022 Due Date:01/24/2022 Duration:7 Days Date Completed:01/24/2022
Task Title:Post Blog Status: Done Start Date:01/25/2022 Due Date:01/25/2022 Duration:1 Days Date Completed:01/25/2022

PROJECT CBH • January Blog Posts

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Benefits of Meal Prep for Seniors Status: Done Start Date:01/19/2022 Due Date:02/07/2022 Duration:19 Days Date Completed:02/04/2022
Task Title:Copywriting Status: Done Start Date:01/19/2022 Due Date:01/21/2022 Duration:2 Days Date Completed:01/19/2022
Task Title:QA Status: Done Start Date:01/24/2022 Due Date:01/25/2022 Duration:1 Days Date Completed:01/25/2022
Task Title:CBH Review/Approval Status: Done Start Date:01/25/2022 Due Date:02/04/2022 Duration:10 Days Date Completed:02/04/2022
Task Title:Post Blog Status: Done Start Date:02/04/2022 Due Date:02/07/2022 Duration:3 Days Date Completed:02/04/2022
Task Title:1 in 4 Senior Adults Fall Each Year Status: Done Start Date:01/24/2022 Due Date:02/09/2022 Duration:16 Days Date Completed:02/14/2022
Task Title:Copywriting Status: Done Start Date:01/24/2022 Due Date:01/26/2022 Duration:2 Days Date Completed:01/25/2022
Task Title:QA Status: Done Start Date:01/27/2022 Due Date:01/28/2022 Duration:1 Days Date Completed:01/28/2022
Task Title:CBH Review/Approval Status: Done Start Date:01/28/2022 Due Date:02/08/2022 Duration:11 Days Date Completed:02/09/2022
Task Title:Post Blog Status: Done Start Date:02/09/2022 Due Date:02/09/2022 Duration:1 Days Date Completed:02/09/2022

PROJECT CBH • February Blog Posts

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Know the Warning Signs of Elder Abuse Status: Done Start Date:02/07/2022 Due Date:02/24/2022 Duration:17 Days Date Completed:02/17/2022
Task Title:Copywriting Status: Done Start Date:02/07/2022 Due Date:02/08/2022 Duration:1 Days Date Completed:02/07/2022
Task Title:QA Status: Done Start Date:02/09/2022 Due Date:02/10/2022 Duration:1 Days Date Completed:02/14/2022
Task Title:CBH Review/Approval Status: Done Start Date:02/11/2022 Due Date:02/17/2022 Duration:6 Days Date Completed:02/17/2022
Task Title:Post Blog Status: Done Start Date:02/17/2022 Due Date:02/17/2022 Duration:1 Days Date Completed:02/17/2022
Task Title:How to Make the Home Safe for Seniors Status: Done Start Date:02/14/2022 Due Date:02/28/2022 Duration:14 Days Date Completed:03/01/2022
Task Title:QA Status: Done Start Date:02/14/2022 Due Date:02/14/2022 Duration:1 Days Date Completed:02/15/2022
Task Title:Copywriting Status: Done Start Date:02/14/2022 Due Date:02/14/2022 Duration:1 Days Date Completed:02/14/2022
Task Title:CBH Review/Approval Status: Done Start Date:02/15/2022 Due Date:02/17/2022 Duration:2 Days Date Completed:02/17/2022
Task Title:Post Blog Status: Done Start Date:02/28/2022 Due Date:02/28/2022 Duration:1 Days Date Completed:02/17/2022

PROJECT CBH • March Blog Post

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:5 Tips for Keeping Seniors Social Status: Done Start Date:03/01/2022 Due Date:03/15/2022 Duration:14 Days Date Completed:04/18/2022
Task Title:Copywriting Status: Done Start Date:03/01/2022 Due Date:03/01/2022 Duration:1 Days Date Completed:02/28/2022
Task Title:CBH Review/Approval Status: Done Start Date:03/01/2022 Due Date:03/14/2022 Duration:13 Days Date Completed:04/04/2022
Task Title:QA Status: Done Start Date:03/02/2022 Due Date:03/02/2022 Duration:1 Days Date Completed:03/02/2022
Task Title:Post Blog Status: Done Start Date:03/15/2022 Due Date:03/15/2022 Duration:1 Days Date Completed:04/04/2022

PROJECT CBH April Blog Post

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Blog Topic Status: Done Start Date: Due Date: Duration: Date Completed:08/05/2022
Task Title:CB Care Copywriting Status: Cancelled Start Date:04/18/2022 Due Date:04/22/2022 Duration:4 Days Date Completed:
Task Title:QA Status: Done Start Date:04/20/2022 Due Date:04/20/2022 Duration:1 Days Date Completed:07/26/2022
Task Title:CBH Review/Approval Status: Done Start Date:04/26/2022 Due Date:04/26/2022 Duration:1 Days Date Completed:04/27/2022
Task Title:Post CB Care Blog Status: Cancelled Start Date:04/29/2022 Due Date:04/29/2022 Duration:1 Days Date Completed:

PROJECT CBH Care- May Blog Post

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Blog Post Status: Done Start Date: Due Date: Duration: Date Completed:09/22/2022
Task Title:CB HomeCare Copywriting Status: Done Start Date:05/12/2022 Due Date:05/16/2022 Duration:4 Days Date Completed:05/16/2022
Task Title:QA Status: Done Start Date:05/16/2022 Due Date:05/17/2022 Duration:1 Days Date Completed:05/24/2022
Task Title:CB HomeCare Review/Approval Status: Done Start Date:05/17/2022 Due Date:05/20/2022 Duration:3 Days Date Completed:05/24/2022
Task Title:Blog Post CB HomeCare Status: Done Start Date:05/23/2022 Due Date:05/25/2022 Duration:2 Days Date Completed:05/24/2022

PROJECT CB Care May Blog Post

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Blog Topic Status: Done Start Date:05/12/2022 Due Date:05/26/2022 Duration:14 Days Date Completed:05/27/2022
Task Title:CB Care Copywriting Status: Done Start Date:05/12/2022 Due Date:05/16/2022 Duration:4 Days Date Completed:05/16/2022
Task Title:QA Status: Done Start Date:05/16/2022 Due Date:05/18/2022 Duration:2 Days Date Completed:05/24/2022
Task Title:CB care client review/approval Status: Done Start Date:05/18/2022 Due Date:05/23/2022 Duration:5 Days Date Completed:05/24/2022
Task Title:Blog Post Status: Done Start Date:05/25/2022 Due Date:05/25/2022 Duration:1 Days Date Completed:05/26/2022

PROJECT CBH June Blog Post

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Blog Post Status: Done Start Date: Due Date: Duration: Date Completed:06/10/2022
Task Title:CB HomeCare Copywriting Status: Done Start Date:05/31/2022 Due Date:06/02/2022 Duration:2 Days Date Completed:06/02/2022
Task Title:QA Status: Done Start Date:06/03/2022 Due Date:06/06/2022 Duration:3 Days Date Completed:06/10/2022
Task Title:CB HomeCare Review/Approval Status: Done Start Date:06/08/2022 Due Date:06/13/2022 Duration:5 Days Date Completed:06/10/2022
Task Title:Blog Post CB HomeCare Status: Done Start Date:06/15/2022 Due Date:06/15/2022 Duration:1 Days Date Completed:06/08/2022

PROJECT CB Care June Blog Post

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Blog Post Status: Done Start Date: Due Date: Duration: Date Completed:08/05/2022
Task Title:CB Care CopyWriting Status: Done Start Date:06/09/2022 Due Date:06/13/2022 Duration:4 Days Date Completed:06/13/2022
Task Title:QA Status: Done Start Date:06/14/2022 Due Date:06/15/2022 Duration:1 Days Date Completed:08/05/2022
Task Title:CB Care Review/Approval Status: Done Start Date:06/16/2022 Due Date:06/21/2022 Duration:5 Days Date Completed:08/05/2022
Task Title:Blog Post CB Care Status: Done Start Date:06/23/2022 Due Date:06/30/2022 Duration:7 Days Date Completed:07/01/2022

PROJECT Logo Update

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed

PROJECT Update Careers Navigation Link

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed

PROJECT CBH Blog Post

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Blog Topic Status: Done Start Date: Due Date: Duration: Date Completed:07/15/2022
Task Title:CB Care Copywriting Status: Done Start Date:04/18/2022 Due Date:04/22/2022 Duration:4 Days Date Completed:07/15/2022
Task Title:QA Status: Done Start Date:04/20/2022 Due Date:04/20/2022 Duration:1 Days Date Completed:07/15/2022
Task Title:CBH Review/Approval Status: Done Start Date:04/26/2022 Due Date:04/26/2022 Duration:1 Days Date Completed:07/15/2022
Task Title:Post CB Care Blog Status: Done Start Date:04/29/2022 Due Date:04/29/2022 Duration:1 Days Date Completed:07/15/2022

PROJECT August CB Care Blog Post

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Blog Post Status: Done Start Date:08/15/2022 Due Date:08/15/2022 Duration:1 Days Date Completed:09/13/2022
Task Title:CB Care CopyWriting Status: Done Start Date:06/09/2022 Due Date:06/13/2022 Duration:4 Days Date Completed:07/08/2022
Task Title:Blog Post CB Care Status: Done Start Date:06/23/2022 Due Date:06/30/2022 Duration:7 Days Date Completed:07/08/2022
Task Title:CB Care Review/Approval Status: Done Start Date:08/16/2022 Due Date:08/18/2022 Duration:2 Days Date Completed:09/13/2022
Task Title:QA Status: Done Start Date:08/19/2022 Due Date:08/19/2022 Duration:1 Days Date Completed:09/13/2022

PROJECT CB Care Blog Post 2022-08-15

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed

PROJECT CBH Blog Post 2022-09-01

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed

PROJECT CB HomeCare Blog Post — Sept 2022

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Copywriting - CB Homecare Status: Done Start Date:09/05/2022 Due Date:09/07/2022 Duration:2 Days Date Completed:09/03/2022
Task Title:Blog QA Status: Done Start Date:09/08/2022 Due Date:09/12/2022 Duration:4 Days Date Completed:09/08/2022
Task Title:Client Approval Status: Done Start Date:09/13/2022 Due Date:09/14/2022 Duration:1 Days Date Completed:09/15/2022
Task Title:Publish Blog to Site Status: Done Start Date:09/15/2022 Due Date:09/16/2022 Duration:1 Days Date Completed:09/15/2022

PROJECT CB HomeCare Update

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed

PROJECT CB HomeCare Blog Post — Oct 2022

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Copywriting - CB HomeCare Status: On Deck Start Date:10/03/2022 Due Date:10/05/2022 Duration:2 Days Date Completed:
Task Title:Blog QA Status: On Deck Start Date:10/06/2022 Due Date:10/10/2022 Duration:4 Days Date Completed:
Task Title:Client Approval Status: On Deck Start Date:10/11/2022 Due Date:10/12/2022 Duration:1 Days Date Completed:
Task Title:Publish Blog to Site Status: On Deck Start Date:10/13/2022 Due Date:10/14/2022 Duration:1 Days Date Completed:

PROJECT CBH Blog Post 2022-10-03

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed

PROJECT CB HomeCare Blog Post — Nov 2022

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Copywriting - CB HomeCare Status: On Deck Start Date:11/07/2022 Due Date:11/09/2022 Duration:2 Days Date Completed:
Task Title:Blog QA Status: On Deck Start Date:11/10/2022 Due Date:11/14/2022 Duration:4 Days Date Completed:
Task Title:Client Approval Status: On Deck Start Date:11/15/2022 Due Date:11/16/2022 Duration:1 Days Date Completed:
Task Title:Publish Blog to Site Status: On Deck Start Date:11/17/2022 Due Date:11/18/2022 Duration:1 Days Date Completed:

PROJECT CB HomeCare Blog Post — Dec 2022

Project Progress

  • 0% Completed
  • 0% In Progress
  • 0% On Deck

Project Status Overview

  • 0% Done
  • 0% In Progress
  • 0% On Deck
  • 0% Awaiting Client
  • 0% On Hold
  • 0% Rush
  • 0% In Quote

Project Progress

Work
0%
Timeline
0%

0 Tasks Due This Week

Task Detail

Task Title Status Start Date Due Date Duration Date Completed
Task Title:Copywriting - CB HomeCare Status: On Deck Start Date:12/05/2022 Due Date:12/07/2022 Duration:2 Days Date Completed:
Task Title:Blog QA Status: On Deck Start Date:12/08/2022 Due Date:12/12/2022 Duration:4 Days Date Completed:
Task Title:Client Approval Status: On Deck Start Date:12/13/2022 Due Date:12/14/2022 Duration:1 Days Date Completed:
Task Title:Publish Blog to Site Status: On Deck Start Date:12/15/2022 Due Date:12/16/2022 Duration:1 Days Date Completed: